HutuoRiver HDD Intersect (2,500m)

2024-06-26

Length:2,500m                                                    Pipe Spec: Φ406.4×7.92


Elevation:21m                                                     Formation: Strongly-weathered granite


Guidance:SmartDrill BTS/Intersection   

               

Description:Main HDD rig suffered mud motor failure, therefore, the other rig must drill intothe                          main pilothole. Accurate intersection must be achieved to avoid side track.


share