Length:2,250m Pipe Spec: Φ711×14.2
Elevation:30m Formation: Strongly-weathered granite
Guidance:SmartdrillBTS/Intersection PilotHole Intersection
Description:Main HDD rig suffered mud motor failure, therefore, the other rig must drill into the main pilot hole. Accurateintersection must be achieved to avoid side track.

